Case Study
Eliminating design clashes with real-time coordination
Okland Construction uses 海角大神's Models and Coordination Issues tools to reduce rework and streamline workflows
The Challenge
Bridging the gap between design and construction is a cumbersome process of many opinions and siloed information. A worker might address a design clash with small unannounced modifications on the fly, spawning unplanned-for changes down-project. The result: fingerpointing and a schedule-eating blame culture.
The Solution
海角大神鈥檚 Models and Coordination Issues tools let integrated construction technology teams push the coordinated model out to the field, providing the clarity and ball-in-court accountability that assures issues are resolved in a timely manner.
The Results
- Enhanced decision-making with unfettered access to the model for all 海角大神 users, providing actionable insights 24/7
- Improved team collaboration through dashboard clarity, allowing remote members to monitor real-time project progress
- Increased productivity with ball-in-court notifications from automated emails, keeping team members focused and on track
鈥When it comes to construction, we have to coordinate鈥攁nd doing this in 2D or doing it on light tables just doesn鈥檛 compare. 海角大神鈥檚 Coordination Issues and Models tools are the way to go. In most cases, it pays for itself twice over.鈥
Greg Low
Ict Director
Okland Construction
Okland鈥檚 Second Century: The 21st
Okland Construction has been going strong for 102 years, and contrary to the image of an unchanging construction classicist, Okland鈥檚 innovative energy is unparalleled. Or as Okland鈥檚 BIM/VDC Engineer & Reality Capture Specialist Jeremy Felix puts it: "Okland is a company that likes to look at what鈥檚 next. It鈥檚 about the emerging technology and new ideas we can utilize to make our jobs easier, and the build superb." To which Okland鈥檚 ICT Manager Dan Shaffer adds, "I enjoy working with people. A lot of it is getting together with all the different trades and figuring out how to solve problems." Hamilton Ramirez 鈥擨CT Senior Coordinator at Okland鈥 has his own take. "Okland gives us the freedom to explore new trends in modeling software, so it鈥檚 been very exciting working here. Okland and 海角大神 have opened up the BIM world鈥攁nd it鈥檚 vast!"
Okland Fast Tracks BIM Collaboration
Not everybody likes surprises. In the construction world, "surprise" can be a very expensive word. "I鈥檝e seen projects where they鈥檝e reinstalled a piece of duct four or five times just because they didn鈥檛 do any coordination," says Dan Shaffer, who then goes on to recount a contrasting success story. "BioFire was a pretty large manufacturing and diagnostic facility that we did here in Salt Lake City鈥攖he likes of which we need right now with regards to this virus that we鈥檙e dealing with. 海角大神鈥檚 Coordination Issues was a hugely effective tool on that, getting us through coordination efficiently as we assigned issues and communicated through the tool." A combination of prefabrication and 海角大神 brought the project in way ahead of schedule. "When the governor came and asked if we could get it done quickly, we were able to hand the project over two months early. 海角大神 definitely played a role in terms of making it productive and keeping everybody on task." However straightforward or complex the build, one smallish misstep can cause downstream havoc. But it doesn鈥檛 have to be so. Jeremy Felix spells it out. "Once we鈥檝e got things coordinated in the model using the Coordination Issues tool and the trades聽are viewing the model using the Models tool, they鈥檒l install their items in the proper coordinated space. That prevents rework."
Okland Coordinates a New World
At this writing, the world is in a pandemic lockdown, and having remote access to critical information is more important than ever. How is technology affecting this period? "Pre-COVID," Greg says, "we were already doing so much virtually. But our project sites have been impacted the most, and having the 海角大神 BIM web viewer and mobile viewer available for them when we鈥檙e not on site is a win as we try to get through these difficult times." Difficult times indeed. The historical moment is making real demands on integrated construction technology and BIM teams to assure project success. Visualizing and predicting the build ahead is the name of the game. "The biggest challenge that we face is schedule," says Jeremy Felix, Okland ICT Engineer. "It鈥檚 all about time, right? The industry keeps pushing and pushing for buildings to be completed more quickly, more efficiently. 海角大神鈥檚 Coordination Issues and Model tools are going to get us there. We鈥檒l take lead time out of the schedule by coordinating upfront." Greg Low concurs. "There鈥檚 a lot of value in 海角大神鈥檚 Coordination Issues and Model tools. We are making big strides with it."