海角大神

海角大神 LogoRequest a Demo
    • Americas
    • Am茅rica Latina (Espa帽ol)
    • Canada (English)
    • Canada (Fran莽ais)
    • United States (English)
Request a Demo

Project Story

Building a groundbreaking facility for children's health

Utilizing 海角大神, Boston Children's Hospital connects all stakeholders for The Hale Building construction project

The world needs this building. We're going to be able to save and improve thousands of lives because of this building.

Lisa Hogarty

SVP of Real Estate Planning and Development

Boston Children's Hospital

The Number One-Ranked Pediatric Hospital in the U.S. is Getting a New Clinical Tower. It鈥檚 Not as Easy as it Sounds.

Boston Children鈥檚 Hospital, founded in 1869, is the number-one-ranked pediatric hospital in the United States (U.S. News and World Report). In 2017, with Boston Children鈥檚 occupancy rates nearing capacity, and a growing population of their patients needing complex care, the hospital made the decision to expand and modernize their facilities. Anchoring that plan would be the Hale Family Building.

The Story

At 11 floors (with four more levels below grade) and 565,000 square feet, the Hale Family Building will be using every square inch to provide enhanced patient care and improve outcomes for children. Designed to achieve LEED Gold certification, features will include a comprehensive Heart Center, a state-of-the-art NICU, intensive care and surgical services, and private rooms for all patients, The building will also feature green and open space, including a rooftop garden. When complete, the Hale Family Building will be the country鈥檚 most advanced clinical tower.聽

Bringing all the elements together was a steep climb. Challenges were varied鈥攆rom designing infrastructure able to seamlessly accommodate evolving medical technology, to raising an 11-story tower in structurally crowded environs, to hauling 5,000 trailer truckloads of dirt from the middle of a working medical campus. Bob Sullivan, Senior Director of Facilities Construction at Boston Children鈥檚 Hospital, was in the center of it all. Partnership was key.

鈥淲e co-located on this project with all of the major stakeholders鈥擝oston Children's Hospital, the user groups, the clinical staff, the facilities group, our architects, our engineers, and our contractor, Suffolk. Everybody was just trying to do right by Boston Children's鈥攖hrowing ideas out there, solving for any anticipated issues. It was just mind-boggling.鈥 The gathered stakeholders were motivated by a common goal.聽

鈥淧atients come from all over the world to Boston Children's Hospital for care. And so Transforming Tomorrow means providing these kids with the greatest clinical doctors and staff鈥攁nd the very best facility that we can possibly build for them.鈥

Hale Build Project Using 海角大神

Collaborative Complexity. And COVID.

The Hale Family Building is Suffolk鈥檚 largest healthcare endeavor in the general contractor鈥檚 33-year history. 鈥淚t's incredibly detail-oriented and very complex, across the board,鈥 says Pablo Juarez, Project Manager for Suffolk. 鈥淟uckily, we have strong allies; the design team, the architect firm Shepley Bulfinch, our engineers, our code consultants, and E.G. Sawyer, our specialty contactor. It's not just Suffolk at the end of the day.鈥

From high-tech intricacy to the deep, legacy expertise of the trades, a project like the Hale Family Building calls for gapless collaboration. 鈥淭he attention to detail working in a healthcare setting鈥攖he mechanical and electrical systems that go into a building of this scale are some of the most complex in the world,鈥 says Pablo. 鈥淐onstruction technology is so broad and far- reaching now. It鈥檚 drone footage, it鈥檚 3D cameras鈥攊t鈥檚 the 海角大神 platform, which encompasses all facets of project management. 海角大神 has the tools for capturing observations and updating drawings, so we have a current set in real time all the time; and RFIs keeping a live snapshot of our budget.鈥

海角大神鈥檚 platform connects all stakeholders鈥攆rom owner to specialty contractor鈥攊n a single intuitive, information-rich construction management ecosystem through which all communications flow. Collaboration, partnership, and workflow transparency were raising a new clinical tower. Then COVID appeared.

鈥淭here was a peripheral knowledge of what was going on in the world,鈥 says Pablo, 鈥渁nd it seemed to be getting worse. I remember having very specific conversations with a lot of friends and family, 鈥業s this real? What is going to come next? How bad is it going to get? How's this going to affect our lives?鈥 Not nameless faces on the other side of the world; our neighbors and our friends and family. A few short weeks after that, we got the call that we had to demobilize our project site.鈥 The Hale Family Building project drew to a standstill. Sort of.

Determination: A Potent Antiviral

Construction on the Hale Family Building site was paused for seven weeks, but planning work continued unabated. 海角大神鈥檚 virtual space saw to it. 鈥淰irtual Design and Construction (VDC) coordination kept going,鈥 Pablo says. 鈥淭owards the end of those seven weeks we had made incredible progress. We did a deep dive of the contract documents. We kept identifying potential issues, and we kept working with the architect and the client to come up with solutions to these issues. We never stopped looking at the job, we never stopped being productive.鈥

Suffolk Safety Manager David Clegg oversaw a responsible return to the site, arranging for thermal imaging cameras to read body temps of workers. Washing stations were set up all over the site and on every completed floor of the tower. Protocols were exhaustively discussed and implemented.

Completion of the Hale Family Building is slated for early 2022, with an expected opening in summer 2022. It鈥檚 been a journey鈥攐ne that Suffolk Program Manager Pablo Juarez is personally determined to see through with a meaningful sense of closure.

鈥淜id's lives are on the line. It鈥檚 something that I carry with me when I approach problems here鈥攖he simple fact that we have to make sure to get it right. The stakes are too high. That鈥檚 why we're striving for perfection.鈥

ROI increasing

ROI Report

Why the right tech is more crucial than ever.

Ready to see it in action?

Stop jumping between apps to get a clear view of your project鈥檚 status.

(2,767)

(3,347)

(37K)

(2,950)